Narducci Learning Center
/The existing Windmill facility will be renovated for grade appropriate swing space to be utilized during renovation of other Providence School facilities.
Read MoreThe existing Windmill facility will be renovated for grade appropriate swing space to be utilized during renovation of other Providence School facilities.
Read MoreThe Gardner Elementary School, located in Gardner MA, will consolidate Pre-K through 4th grade into a new 147,120 SF facility.
Read MoreThe New George H. Mitchell Elementary School will replace the previous George H. Mitchell Elementary School at 500 South Street, Bridgewater, MA.
Read MoreAddition and Renovations to John J. Moran Medium Security Facility.
Read MoreA new three-story 160,000 SF elementary school serving Pre-K to fourth grade in Wareham, Massachusetts.
Read MoreNew 187,100 SF Middle-High School will serve up to 860 students in grades 5-12.
Read MoreThis project will be a single story addition of 14,000 SF to the northeast corner of the existing 1990’s addition of the Mildred H. Aitken Elementary School and renovations to existing facilities.
Read MoreNew, 119,693 SF Elementary School for the City of Taunton, MA.
Read MoreThe Clyde Brown Elementary School in Millis, MA is a new 89,850 SF Elementary School located next to the current elementary school that will eventually be demolished.
Read MoreConstruction of the Apartment Building Consists of two 6 story towers with a 1 story connector between the two. There will be 122 Apartment Units within the two towers, which will house 500 students.
Read MoreNew, 90,975 SF elementary school for the Town of Needham.
Read MoreThis project includes construction of a single story building with a clerestory and partial
basement encompassing approximately 26,600 GSF.
New 92,000 SF, 3-story steel construction building, including a 8,000 SF, 1-story gymnasium with a pre-engineered steel frame. Sitework includes walkways, landscaping, roadway and parking.
Read MoreThis project includes construction of a new 231,509 SF, 1,395 student middle school serving grades 5 through 8. The project includes a 4-story classroom core with each floor dedicated to one grade and a common outdoor learning area.
Read MoreRenovations of approximately 80,000 square feet of an existing building for use as an elementary school and new 6,000 square foot Gym addition.
Read MoreNew 130,000 SF Middle School addition to existing High School including 11,000 SF of renovation and new 22,000 SF Auditorium at High School
Read MoreIn July of 2015 Agostini began construction on the new Plymouth South High School. After removal of a substantial quantity of unsuitable soils within the building footprint, Agostini self-performed the foundation work. Structural steel erection is currently ongoing.
Read MoreConstruction of new 10,400 square foot police facility and a total renovation to a 9,500 square foot of existing fire station.
Read MoreThe Fiske and Schofield Elementary Schools are scheduled to undergo extensive renovations over an eight-week period during summer vacation. Renovations include upgrades to the HVAC System, fire protection upgrades, plumbing, fire alarm, security, electrical and interior fit-up.
Read MoreThe University of Massachusetts Dartmouth Charlton College of Business is scheduled to receive a 20,600SF addition to their existing building. The new academic wing is constructed of an ultra high performance concrete rain screen system along with a metal panel and curtain wall system.